Vesic: Construction of metro will start in November, completion of both lines by 2030
BizLife 19.07.2021 | Beta
“Currently, a risk register is being prepared, that is, all the buildings on the metro route are being surveyed in order to determine their state, especially around the stations themselves.
The metro will be up to 47 meters deep on some sections, and for example, 19 meters at Dorcol,” said Vesic for TV Prva. According to him, the metro will exist for “centuries”, and as he stated, the beginning of construction this year would be a “historic event” for Belgrade, while the first step would be the construction of a depot at Makis Field. “The construction of the first and second lines will cost around 4.6 billion euros. The metro could not be built with