Vučić at Staro Sajmište: Inspects works on the New Sava Bridge PHOTO/VIDEO
B92 pre 1 dan

Serbian President Aleksandar Vučić and Finance Minister Siniša Mali are inspecting construction works on the New Sava Bridge at Staro Sajmište in Belgrade.
"Mali pointed out that the bridge will be 420 meters long, with two lanes in each direction. A tram line will also run across the bridge. The biggest problem is unexploded bombs from World War II." The New Sava Bridge will be fully adapted for pedestrians and cyclists, and will have a total of six traffic lanes, four for cars and two for trams. According to studies, thanks to the new bridge, the number of passengers on Branko’s Bridge will decrease by 8%, on Gazela












